User:Paradox-01/quotes sturmanderung

From OniGalore
Jump to navigation Jump to search

First Stage:

1) Worldwide infiltration of Atmospheric Conversion Centers # ACC_Phase1 (infiltration)
2) Modification of ACC core filtration systems with smuggled parts # ACC_Phase2 (modification)
3) Remote satellite uplink/triggering systems installed: 417 regional processors on-line # Satellite_Phase1 (ACCs equipped with remote controllers)
4) # [missing](...)

Second Stage:

5) Low Orbit satellite control signal burrow established # Satellite_Phase2 (connection to orbit)
6) STURMANDERUNG mountain compound construction # Complex_Phase1 (commando base)
7) Daodan core technology (ref.TITAN\ssob) # Daodan_Phase1 (research)
8) # [missing](...)

Third Stage:

9) Daodan core technology (ref.TITAN\uwlb) # Daodan_Phase2 (production)
10) STURMANDERUNG mountain compound construction # Complex_Phase2 (second base for research, production, implantation, and drill of Daodan corps)
11) Symbiote candidate selection and implantation # Daodan_Phase3 (selection and implantation)
12) # [missing](...)

Final Stage:

13) ACC installation modification COMPLETE # ACC_Phase1+2 (Second Stage completed: infiltration, modification and equipped with remote controller)
14) STURMANDERUNG mountain compound COMPLETE # Complex_Phase1+2 (First Stage completed: both HQ constrution)
15) STURMANDERUNG transmitter array COMPLETE # Satellite_Phase1+2 (equipped with remote controllers, satellites set-up done)

# Activation of satellite connection from base to ACCs
# STURMANDERUNG-Puls' Activation on 3. December (2032 / 2055)
# Caution: Satellites did not reach all ACCs
# Caution: Overload in ACCs noticed