First Stage:
- 1) Worldwide infiltration of Atmospheric Conversion Centers # ACC_Phase1 (infiltration)
- 2) Modification of ACC core filtration systems with smuggled parts # ACC_Phase2 (modification)
- 3) Remote satellite uplink/triggering systems installed: 417 regional processors on-line # Satellite_Phase1 (ACCs equipped with remote controllers)
- 4) # [missing](...)
Second Stage:
- 5) Low Orbit satellite control signal burrow established # Satellite_Phase2 (connection to orbit)
- 6) STURMANDERUNG mountain compound construction # Complex_Phase1 (commando base)
- 7) Daodan core technology (ref.TITAN\ssob) # Daodan_Phase1 (research)
- 8) # [missing](...)
Third Stage:
- 9) Daodan core technology (ref.TITAN\uwlb) # Daodan_Phase2 (production)
- 10) STURMANDERUNG mountain compound construction # Complex_Phase2 (second base for research, production, implantation, and drill of Daodan corps)
- 11) Symbiote candidate selection and implantation # Daodan_Phase3 (selection and implantation)
- 12) # [missing](...)
Final Stage:
- 13) ACC installation modification COMPLETE # ACC_Phase1+2 (Second Stage completed: infiltration, modification and equipped with remote controller)
- 14) STURMANDERUNG mountain compound COMPLETE # Complex_Phase1+2 (First Stage completed: both HQ constrution)
- 15) STURMANDERUNG transmitter array COMPLETE # Satellite_Phase1+2 (equipped with remote controllers, satellites set-up done)
# Activation of satellite connection from base to ACCs
# STURMANDERUNG-Puls' Activation on 3. December (2032 / 2055)
# Caution: Satellites did not reach all ACCs
# Caution: Overload in ACCs noticed
|