5,391
edits
| mNo edit summary | mNo edit summary | ||
| Line 17: | Line 17: | ||
| | | | | ||
| {|align=right border=1 cellspacing=0 | {|align=right border=1 cellspacing=0 | ||
| |align=center|Tunnels between SP1 and SP2<br>The truck takes  | |align=center|Tunnels between SP1 and SP2<br>The truck takes tunnel Blue | ||
| |} | |} | ||
| Tunnel Red will remain closed until the installation of new blast door: model [[Musashi]] DX1000. | Tunnel Red will remain closed until the installation of new blast door: model [[Musashi]] DX1000. | ||