Quotes/Consoles/level 19a: Difference between revisions

From OniGalore
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
Line 17: Line 17:
|
|
{|align=right border=1 cellspacing=0
{|align=right border=1 cellspacing=0
|align=center|Tunnels between SP1 and SP2<br>The truck takes Tunnel Blue
|align=center|Tunnels between SP1 and SP2<br>The truck takes tunnel Blue
|}
|}
Tunnel Red will remain closed until the installation of new blast door: model [[Musashi]] DX1000.
Tunnel Red will remain closed until the installation of new blast door: model [[Musashi]] DX1000.

Revision as of 21:34, 3 October 2007

dwarf = low-security access
(as opposed to TITAN)
Possible reference to Myth
mtnc = mountain compound?
dwarf\mtnc\bulletin

Incidence Report: Damage to loading bay tunnel Red.

At approximately 08:00:00 a collision occurred between parked vehicle APC12 and BGI vehicle #102472.

The impact forced the vehicles through the storm doors at Stop Point B.

The vehicles and debris were removed by 10:33:00. The driver (S. Uade, Green Division) suffered minor injuries.

Tunnels between SP1 and SP2
The truck takes tunnel Blue

Tunnel Red will remain closed until the installation of new blast door: model Musashi DX1000.

Recommendations:

1) Stop Point A operators must coordinate Blue tunnel for two-way traffic.

2) Reprimand all personnel for sloppy operating behavior.

Musashi telling the Syndicate
to buy Musashi Blast Doors
How much did he pay the driver?

3) Replace all remaining doors with Musashi DX1000.


filed by: D.Musashi