First Stage (project fundamentals):
- 1) STURMANDERUNG mountain compound construction # Complex_Phase1 (commando base it-self and equipped with a TITAN module)
- 2) STURMANDERUNG mountain compound construction # Complex_Phase2 (second base for research, production, implantation, and drill of Daodan corps)
Second Stage > ACC / satellite connection:
- 3A) Worldwide infiltration of Atmospheric Conversion Centers # ACC_Phase1 (infiltration)
- 4A) Modification of ACC core filtration systems with smuggled parts # ACC_Phase2 (modification)
- 5A) Remote satellite uplink/triggering systems installed: 417 regional processors on-line # Satellite_Phase1 (ACCs equipped with remote controllers)
- 6) Low Orbit satellite control signal burrow established # Satellite_Phase2 (connection to orbit)
Third Stage > Daodan:
- 3B) Daodan core technology (ref.TITAN\ssob) # Daodan_Phase1 (research)
- 4B) Daodan core technology (ref.TITAN\uwlb) # Daodan_Phase2 (modifications and mass production studies in aspect of an Beta-Daodan
- 5B) Symbiote candidate selection and implantation # Daodan_Phase3 (selection and implantation)
Final Stage (Summary and Check):
- 7A) STURMANDERUNG mountain compound COMPLETE # Complex_Phase1+2 (First Stage completed: both HQ constrution)
- 7B) ACC installation modification COMPLETE # ACC_Phase1+2 (Second Stage completed: infiltration, modification and equipped with remote controller)
- 7C) Daodan-Subprojectes COMPLETE # Daodan_Phase1+2+3 (Third Stage completed: research and production for Alpha- and Beta-Daodan structures plus implantation on own personnels)
- 7D) STURMANDERUNG-[commando base-]transmitter array COMPLETE # Satellite_Phase1+2 (equipped with remote controllers, satellites set-up done)
# Activation of satellite connection from base to ACCs
# STURMANDERUNG-Puls' Activation on 3. December 2055
# Caution: Satellites did not reach all ACCs
# Caution: Overload in ACCs noticed
|