Quotes/Consoles/level 10a: Difference between revisions
mNo edit summary |
mNo edit summary |
||
Line 22: | Line 22: | ||
|} | |} | ||
[[Category:Quotes]] | <noinclude>[[Category:Quotes]]</noinclude> |
Latest revision as of 23:25, 27 June 2010
emchannel, 106.4, tra.init.@ 22:15:07:43 <->security substation 106 ->failure response teams The unexpected detonation in Transformer Bay 203 @22:13:24:19 caused irrevocable damage to the control units for containment pools: 28.35.01/02/03 Localized failsafes have been initialized, and access to containment zone 28.25 is now restricted at nodes: 28.01/02 Personnel caught within the zone should attempt surge management via the breaker consoles above each containment pool. |
This event has been categorized as Bio-Hazard Level 5, and Control has detached Failure Management Squad Bravo (cybernetic) to the affected zone. The bots should be able to withstand hazards of this magnitude. But Bravo Leader has reported liminal systemic variance in his teams' core logic processors. <-autoreply in progress emchannel, 106.4, tra.end.@ 22:15:07:45 |