Quotes/Consoles/level 19c: Difference between revisions

From OniGalore
Jump to navigation Jump to search
mNo edit summary
m (alignment fixes/breaks :-\)
Line 3: Line 3:
;TITAN\mtnc\uplink...dcs113
;TITAN\mtnc\uplink...dcs113
;Accessing Data Files...
;Accessing Data Files...
{|align=right border=1 cellspacing=0 cellpadding=0
{|style="float:right" border=1 cellspacing=0 cellpadding=0
|align=center|TITAN = restricted access<br>dcs = data console?<br>Alignment is critical for low-orbit satelites<br>mtnc = mountain compound?<br>ssob = ???
|align=center|TITAN = restricted access<br>dcs = data console?<br>Alignment is critical for low-orbit satelites<br>mtnc = mountain compound?<br>ssob = ???
|}
|}
Line 17: Line 17:
|
|
'''STURMANDERUNG baseline report: [[wikipedia:Dioxin|Dioxin]] levels'''
'''STURMANDERUNG baseline report: [[wikipedia:Dioxin|Dioxin]] levels'''
{|align=right border=1 cellspacing=0
{|style="float:right" border=1 cellspacing=0
|Actually, that's a '''(152 - 97)/97 = 56.70%''' increase<br>As for the '''(152 - 97)/152 = 36.18%''' ,<br>it would have been the ''decrease'' percentage<br>if the amount had gone ''down'' from 152 to 97[[wiktionary:ppm|ppm]]
|Actually, that's a '''(152 - 97)/97 = 56.70%''' increase<br>As for the '''(152 - 97)/152 = 36.18%''' ,<br>it would have been the ''decrease'' percentage<br>if the amount had gone ''down'' from 152 to 97[[wiktionary:ppm|ppm]]
|}
|}

Revision as of 18:05, 21 May 2013

TITAN\mtnc\uplink...dcs113
Accessing Data Files...
TITAN = restricted access
dcs = data console?
Alignment is critical for low-orbit satelites
mtnc = mountain compound?
ssob = ???

Project: STURMANDERUNG
Secondary Stage:
5) Low Orbit satellite control signal burrow established
6) STURMANDERUNG mountain compound construction
7) Daodan core technology (ref.TITAN\ssob)

<<<Secondary Stage: COMPLETE>>>

STURMANDERUNG baseline report: Dioxin levels

Actually, that's a (152 - 97)/97 = 56.70% increase
As for the (152 - 97)/152 = 36.18% ,
it would have been the decrease percentage
if the amount had gone down from 152 to 97ppm

Project initialization: 97 ppm

Primary stage: 100 ppm

Secondary stage: 152 ppm

36.18% increase