Quotes/Consoles/level 9a

From OniGalore
< Quotes‎ | Consoles
Revision as of 23:37, 27 June 2010 by Iritscen (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
OPERATIONS MEMO

TOWER SHUTDOWN
Processor Tower Beta Nine will be shut down for three days prior to and following the test of the second tier backup unit as ordered by the BioCrisis Subcommittee. Operations Control is concerned that a sudden increase in demand would tax the system beyond the buffer allowed by the engineering specifications.

TOWER SHUTDOWN

The new systems modifications are designed to combat the steady rise in Class 3 atmospheric pollutants but the new parts have not been tested at full capacity. The second tier test will be followed by a test of the third tier, assuming everything goes according to plan.