Jump to content

BioCrisis: Difference between revisions

1,236 bytes removed ,  4 October 2007
m
m ("final" touch ^^)
Line 6: Line 6:
==Facts==
==Facts==
===Class 3 and 4 toxins===
===Class 3 and 4 toxins===
Mentioned in the context of the hypothetical inversion process (see below).
Class 4 (airborne) mentioned only in the context of the hypothetical inversion process (see below).
:Steady rise rise in class 3 pollutants mentioned in the testing protocol (improved technology).
===Dioxin===
===Dioxin===
*A steady rise in [[wikipedia:Dioxin|dioxin]] levels is reported by the [[STURMANDERUNG]] consoles in {{C14}}.
A steady rise in [[wikipedia:Dioxin|dioxin]] levels is reported by the [[STURMANDERUNG]] consoles in {{C14}}.
:(this is presented as a side effect of the preliminary phase of Muro's plan)
:(this is presented as a side effect of the preliminary phase of Muro's plan)
::(the main phase apparently being to trigger the inversion process below)
::(the main phase apparently being to trigger the inversion process below)
===BioCrisis Subcommittee===
===BioCrisis Subcommittee===
[[Quotes/Consoles#BioCrisis|Quote]] from {{C7}}
[[Quotes/Consoles#BioCrisis|Quote]] from {{C7}}
----
{{:Quotes/Consoles/level_9a}}
----
;OPERATIONS MEMO
 
TOWER SHUTDOWN<br>
Processor Tower Beta Nine will be shut down for three days prior to and following the test of the second tier backup unit as ordered by the BioCrisis Subcommittee. Operations Control is concerned that a sudden increase in demand would tax the system beyond the buffer allowed by the engineering specifications.
----
TOWER SHUTDOWN
 
The new systems modifications are designed to combat the steady rise in Class 3 atmospheric pollutants but the new parts have not been tested at full capacity. The second tier test will be followed by a test of the third tier, assuming everything goes according to plan.
 
 
----
===Inversion process===
===Inversion process===
:Hypothetical malfunctioning of the [[ACC]]s with dramatic consequences.
:Hypothetical malfunctioning of the [[ACC]]s with dramatic consequences.
[[Quotes/Consoles#ATMOSPHERIC_INVERSION_PROCESS|Quote]] from {{C7}}
[[Quotes/Consoles#ATMOSPHERIC_INVERSION_PROCESS|Quote]] from {{C7}}
----
{{:Quotes/Consoles/level_9c}}
----
;OPERATIONS MEMO


ATMOSPHERIC INVERSION PROCESS TESTING<br>
According to our data an inversion of the primary charge couplers would effectively reverse the charge in the toxin treatment subsystems rendering the ionization process useless.


As a result the Class 3 toxins we are most concerned about would pass through the system untreated. There is even a chance that the they would be charged as they passed through the coupler transforming them into Class 4 airborne toxins.
----
----
ATMOSPHERIC INVERSION PROCESS TESTING [cont]
Needless to say the environmental damage in such an event would be catastrophic and irreversible. All crews must be aware of this danger and pay strict attention to the posted maintenance schedules and testing protocols.


----
==Added value==
==Added value==
===Easy to ignore===
===Easy to ignore===