Quotes/Consoles/level 9a: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 12: | Line 12: | ||
The new systems modifications are designed to combat the steady rise in Class 3 atmospheric pollutants but the new parts have not been tested at full capacity. The second tier test will be followed by a test of the third tier, assuming everything goes according to plan. | The new systems modifications are designed to combat the steady rise in Class 3 atmospheric pollutants but the new parts have not been tested at full capacity. The second tier test will be followed by a test of the third tier, assuming everything goes according to plan. | ||
|} | |} | ||
<noinclude>[[Category:Quotes]]</noinclude> |
Latest revision as of 23:37, 27 June 2010
TOWER SHUTDOWN |
TOWER SHUTDOWN The new systems modifications are designed to combat the steady rise in Class 3 atmospheric pollutants but the new parts have not been tested at full capacity. The second tier test will be followed by a test of the third tier, assuming everything goes according to plan. |