Jump to content

Quotes/Consoles/level 9a: Difference between revisions

m
no edit summary
mNo edit summary
 
mNo edit summary
 
Line 12: Line 12:
The new systems modifications are designed to combat the steady rise in Class 3 atmospheric pollutants but the new parts have not been tested at full capacity. The second tier test will be followed by a test of the third tier, assuming everything goes according to plan.
The new systems modifications are designed to combat the steady rise in Class 3 atmospheric pollutants but the new parts have not been tested at full capacity. The second tier test will be followed by a test of the third tier, assuming everything goes according to plan.
|}
|}
<noinclude>[[Category:Quotes]]</noinclude>