User:Paradox-01/quotes sturmanderung rearranged: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
m (+cat) |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
{|border=1 cellspacing=0 cellpadding=4 width=100% | {|border=1 cellspacing=0 cellpadding=4 width=100% | ||
|style="background-color:#DFE"| | |style="background-color:#DFE"| | ||
First Stage (project fundamentals): | |||
: 1) | : 1) STURMANDERUNG mountain compound construction <span style="background-color:#FFF"><nowiki>#</nowiki> Complex_Phase1 (commando base it-self and equipped with a TITAN module)</span> | ||
: 2) | : 2) STURMANDERUNG mountain compound construction <span style="background-color:#FFF"><nowiki>#</nowiki> Complex_Phase2 (second base for research, production, implantation, and drill of Daodan corps)</span> | ||
Second Stage > ACC / satellite connection: | |||
: 3A) | : 3A) Worldwide infiltration of Atmospheric Conversion Centers <span style="background-color:#FFF"><nowiki>#</nowiki> ACC_Phase1 (infiltration)</span> | ||
: 4A) | : 4A) Modification of ACC core filtration systems with smuggled parts <span style="background-color:#FFF"><nowiki>#</nowiki> ACC_Phase2 (modification)</span> | ||
: 5A) | : 5A) Remote satellite uplink/triggering systems installed: 417 regional processors on-line <span style="background-color:#FFF"><nowiki>#</nowiki> Satellite_Phase1 (ACCs equipped with remote controllers)</span> | ||
: 6) | : 6) Low Orbit satellite control signal burrow established <span style="background-color:#FFF"><nowiki>#</nowiki> Satellite_Phase2 (connection to orbit)</span> | ||
Third Stage > Daodan: | |||
: 3B) Daodan | : 3B) Daodan core technology (ref.TITAN\ssob) <span style="background-color:#FFF"><nowiki>#</nowiki> Daodan_Phase1 (research)</span> | ||
: 4B) Daodan | : 4B) Daodan core technology (ref.TITAN\uwlb) <span style="background-color:#FFF"><nowiki>#</nowiki> Daodan_Phase2 (modifications and mass production studies in aspect of an Beta-Daodan</span> | ||
: 5B) | : 5B) Symbiote candidate selection and implantation <span style="background-color:#FFF"><nowiki>#</nowiki> Daodan_Phase3 (selection and implantation) | ||
Final Stage (Summary and Check): | |||
: 7A) | : 7A) STURMANDERUNG mountain compound COMPLETE <span style="background-color:#FFF"><nowiki>#</nowiki> Complex_Phase1+2 (First Stage completed: both HQ constrution)</span> | ||
: 7B) | : 7B) ACC installation modification COMPLETE <span style="background-color:#FFF"><nowiki>#</nowiki> ACC_Phase1+2 (Second Stage completed: infiltration, modification and equipped with remote controller)</span> | ||
: <span style="background-color:#FFF">7C) Daodan- | : <span style="background-color:#FFF">7C) Daodan-Subprojectes COMPLETE <nowiki>#</nowiki> Daodan_Phase1+2+3 (Third Stage completed: research and production for Alpha- and Beta-Daodan structures plus implantation on own personnels)</span> | ||
: 7D) STURMANDERUNG-<span style="background-color:#FFF">[ | : 7D) STURMANDERUNG-<span style="background-color:#FFF">[commando base-]</span>transmitter array COMPLETE <span style="background-color:#FFF"><nowiki>#</nowiki> Satellite_Phase1+2 (equipped with remote controllers, satellites set-up done)</span> | ||
<span style="background-color:#FFF"><nowiki>#</nowiki> | <span style="background-color:#FFF"><nowiki>#</nowiki> Activation of satellite connection from base to ACCs<br> | ||
<nowiki>#</nowiki> | <nowiki>#</nowiki> STURMANDERUNG-Puls' Activation on 3. December 2055<br> | ||
<nowiki>#</nowiki> | <nowiki>#</nowiki> Caution: Satellites did not reach all ACCs<br> | ||
<nowiki>#</nowiki> | <nowiki>#</nowiki> Caution: Overload in ACCs noticed</span> | ||
|} | |} | ||
[[Category:Oni 2]] |
Latest revision as of 17:44, 16 April 2013
First Stage (project fundamentals):
Second Stage > ACC / satellite connection:
Third Stage > Daodan:
Final Stage (Summary and Check):
# Activation of satellite connection from base to ACCs |